The Site Prep

Checklist

Know exactly what your property needs before your Kasita arrives — access, foundation, and utilities, walked through step by step.

01

Access & delivery — can a unit physically reach your lot?

02

Foundation & ground — leveling, pads, and options

03

Utilities — water, sewer, and electrical readiness

04

A final pre-delivery walk-through

Kasita Crafters — homes for everyone

kasitacrafters.com

BEFORE YOU START

A smooth install starts months early.

The day your Kasita arrives is the easy part — if the groundwork is done. This checklist walks your property the way our install team does, so nothing surprises you on delivery day.

Print it, walk your lot, and tick what's ready. Anything you can't confirm becomes a question for your free evaluation.

HOW TO USE THIS CHECKLIST

Each item is something to confirm before delivery. ☐ means you can check it yourself. ⚠ means it's worth a professional's eye — we can connect you with vetted local help.

3 areas

Access · ground · utilities

~2–3 wks

Typical prep lead time

$3k–$12k

Typical prep budget

Kasita Crafters — Site Prep Checklist

Page 01 of 05

PART 1 — ACCESS & DELIVERY

Can a unit reach your lot?

Your Kasita arrives on a flatbed and is set with a crane or trailer. Before anything else, confirm the path in.

Access path at least 12 ft wide for the delivery truck

⚠ PRO

Overhead clearance — no branches or wires under ~14 ft

Gates or fence openings are wide enough, or removable

Firm ground for the truck and crane — not soft or waterlogged

⚠ PRO

Room to maneuver — turning radius for a flatbed or crane

⚠ PRO

Shared-driveway or neighbor access confirmed in advance

A clear staging area near the final placement spot

Kasita Crafters — Site Prep Checklist

Page 02 of 05

PART 2 — FOUNDATION & GROUND

Where the unit will sit.

A level, well-drained pad is what makes a Kasita last. Confirm the ground before you order materials.

Pad location is roughly level — under about 6 in. of slope

⚠ PRO

Final spot marked and measured to the unit's footprint

Foundation type chosen — gravel pad, piers, or slab

⚠ PRO

Drainage flows away from the unit, not toward it

Setbacks from property lines confirmed for your city

⚠ PRO

Soft or expansive soil assessed where relevant

Trees or landscaping needing removal are flagged

Kasita Crafters — Site Prep Checklist

Page 03 of 05

PART 3 — UTILITIES

Power, water, and waste.

Most units need water, sewer, and electrical. Confirm each is reachable — or that you have a plan to extend it.

Water line within reach, or a plan to extend it

Sewer connection or an approved septic / holding plan

⚠ PRO

Electrical panel has spare capacity (often 100–200A)

⚠ PRO

Trench route mapped; 811 “call before you dig” done

Permits for utility work identified

Internet / data run considered — for offices & rentals

Gas line — only if your unit uses gas (most don't)

Kasita Crafters — Site Prep Checklist

Page 04 of 05

PART 4 — FINAL WALK, THE DAY BEFORE

Almost there.

Run this final check the day before delivery so the install goes smoothly.

Site clear and accessible for the truck

Pad ready, level, and marked

Utilities stubbed and ready to connect

Someone on-site to receive the delivery

Final payment and paperwork ready

Not sure about a few boxes?

That's exactly what a free evaluation is for — we'll walk your lot with you and sort the rest.